Skip to content

Milestones

List view

  • No due date
    0/2 issues closed
  • PWA Release to the manufacturer.

    Overdue by 1 month(s)
    Due by November 25, 2025
    19/31 issues closed
  • Firmware suitable for the GPAD Demo held on JUNE 15 in Austin

    Overdue by 1 month(s)
    Due by November 19, 2025
    32/93 issues closed
  • This marks the final design of an enclosure for Krake, using a 28 mm speaker retainer.

    Overdue by 1 month(s)
    Due by November 30, 2025
    11/19 issues closed
  • Krake™ V2.0 first revision for the user manual (How to integrate with a PMD), developer manual (How to extend the design and features Krake API ), and operator manual (How to use Krake with a PMD).

    Overdue by 21 day(s)
    Due by December 18, 2025
    4/26 issues closed