You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Is your feature request related to a problem? Please describe.
We need a new feature for accession records that allows for the tracking of multiple batches of specimens under a single agreement. This would replace the current method of creating separate accession numbers for each batch, which is inefficient and difficult to manage. The primary goal is to improve the accuracy of records and streamline the process of applying accession numbers to specimens from long-term projects.
Currently, when specimens arrive in batches under a single permit or agreement, a new accession number is created for each shipment. While this allows the organization to track the date and number of specimens for its KPI reporting, the system is impractical for long-running projects because:
Material is mixed: As researchers work with the specimens, they often get combined, making it extremely difficult to trace them back to their original, separate accession numbers.
Unnecessary work is created: It is time-consuming and inefficient to apply and manage multiple accession numbers for specimens that are all part of the same project.
Confusion is caused: The use of multiple accession numbers for a single project complicates the organization's record-keeping and data management.
Describe the solution you'd like
RBGE requests the development of a new feature within the accession record that allows for the structured recording of multiple batches. This new feature should include:
A dedicated section within the accession record for Batch Tracking.
The ability to add multiple "batch" entries to a single accession record.
For each batch entry, the organization needs to be able to record the following information like received date and number of Specimens.
Hey Robyn,
I have similar issues with our collection, but because we don’t have reporting requirements associated with Accessions, I have been lumping accessions by donor/project and explain in the remarks field that the accessions came from separate shipments/dates.
It seems like a good way to do “batches” might be to enable a many-to-one relationship between the already existing “Shipment” table and the Accession table in the next Specify Schema version, no?
The “Shipment” table links many-to-one already to the Exchange, Borrow, and Loan tables but not to Accessions for some reason. It’s odd; logically “Shipments” should be able to be linked to any table that has to do with material physically coming or going from a collection. And even if material isn’t technically “shipped” (for example, dropped off) it seems like Shipment is still an appropriate table to store “incoming batch” info in.
I would support that link between Shipments and Accessions being created rather than an additional table being added to the schema.
1 - EnhancementImprovements or extensions to existing behavior
2 participants
Heading
Bold
Italic
Quote
Code
Link
Numbered list
Unordered list
Task list
Attach files
Mention
Reference
Menu
reacted with thumbs up emoji reacted with thumbs down emoji reacted with laugh emoji reacted with hooray emoji reacted with confused emoji reacted with heart emoji reacted with rocket emoji reacted with eyes emoji
Uh oh!
There was an error while loading. Please reload this page.
Is your feature request related to a problem? Please describe.
We need a new feature for accession records that allows for the tracking of multiple batches of specimens under a single agreement. This would replace the current method of creating separate accession numbers for each batch, which is inefficient and difficult to manage. The primary goal is to improve the accuracy of records and streamline the process of applying accession numbers to specimens from long-term projects.
Currently, when specimens arrive in batches under a single permit or agreement, a new accession number is created for each shipment. While this allows the organization to track the date and number of specimens for its KPI reporting, the system is impractical for long-running projects because:
Describe the solution you'd like
RBGE requests the development of a new feature within the accession record that allows for the structured recording of multiple batches. This new feature should include:
Reported By
Robyn Drinkwater, RBGE
Additional context
Here is the link to the discourse post mentioning the feature request: https://discourse.specifysoftware.org/t/multiple-batches-of-material-in-accession-records/2768
All reactions