Skip to content

DAOS-18782 cart: Change mrc settings#18022

Open
frostedcmos wants to merge 1 commit intorelease/2.8from
frostedcmos/DAOS-18782-2.8
Open

DAOS-18782 cart: Change mrc settings#18022
frostedcmos wants to merge 1 commit intorelease/2.8from
frostedcmos/DAOS-18782-2.8

Conversation

@frostedcmos
Copy link
Copy Markdown
Contributor

  • for all providers except verbs - disable mrc on servers, enable on clients
  • for verbs -- disable mrc on servers and clients

Steps for the author:

  • Commit message follows the guidelines.
  • Appropriate Features or Test-tag pragmas were used.
  • Appropriate Functional Test Stages were run.
  • At least two positive code reviews including at least one code owner from each category referenced in the PR.
  • Testing is complete. If necessary, forced-landing label added and a reason added in a comment.

After all prior steps are complete:

  • Gatekeeper requested (daos-gatekeeper added as a reviewer).

- for all providers except verbs - disable mrc on servers,
  enable on clients
- for verbs -- disable mrc on servers and clients

Signed-off-by: Alexander A Oganezov <[email protected]>
@github-actions
Copy link
Copy Markdown

Ticket title is 'CART: Disable mrc for ucx and ofi on engines'
Status is 'In Review'
Labels: 'scrubbed_2.8'
https://daosio.atlassian.net/browse/DAOS-18782

@daosbuild3
Copy link
Copy Markdown
Collaborator

Test stage Functional Hardware Medium MD on SSD completed with status UNSTABLE. https://jenkins-3.daos.hpc.amslabs.hpecorp.net/job/daos-stack/job/daos//view/change-requests/job/PR-18022/2/testReport/

@frostedcmos
Copy link
Copy Markdown
Contributor Author

1 failure due to https://daosio.atlassian.net/browse/DAOS-18813

@frostedcmos frostedcmos added the clean-cherry-pick Cherry-pick from another branch that did not require additional edits label Apr 16, 2026
@frostedcmos frostedcmos requested a review from a team April 16, 2026 20:16
@frostedcmos frostedcmos added the forced-landing The PR has known failures or has intentionally reduced testing, but should still be landed. label Apr 16, 2026
@daltonbohning daltonbohning added the waiting-for-merge-approval Waiting for merge approval label Apr 16, 2026
@sylviachanoiyee
Copy link
Copy Markdown
Contributor

It's been approved to merge to 2.8

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

clean-cherry-pick Cherry-pick from another branch that did not require additional edits forced-landing The PR has known failures or has intentionally reduced testing, but should still be landed. waiting-for-merge-approval Waiting for merge approval

Development

Successfully merging this pull request may close these issues.

5 participants